Set the digital delivery level from the design stage
Whoever develops a building decides how digitally equipped it is at handover. The
Where it goes wrong
In a construction project, IT often only comes up at the end. By then the ceilings are closed and the specifications are fixed. Every change becomes extra work, and the tenant only discovers shortcomings on moving in.
Also read: future-proof building.
What the IT-Label gives you
A concrete target
Include an IT delivery level in the brief, for example "at least IT2 PLUG & PLAY".
More informationVerifiable handover
At handover, a Certified Partner determines whether the level has really been achieved.
More informationA stronger story for the market
A labelled building shows that it is ready for the future.
More informationStarting early is cheaper
Space for cabling, a technical room and spare capacity are easy in the design. Afterwards they are expensive.
Frequently asked questions
Want to have the delivery level determined?
An independent audit at handover, translated into an
Related information
Who is the IT-Label for?
The
IT2 PLUG & PLAY: IT delivery level
IT2 PLUG & PLAY offers a fibre optic connection, CAT6 cabling and functional
IT-Label certification
The official
Why an IT-Label ?
AI, network strain and Smart Buildings raise a new question: is a building digitally ready for how companies work today and tomorrow?
The IT-Label for design & build
In a design & build contract, IT often falls between disciplines. The