Rules and labels for digital building quality in other countries
How do South Korea, Spain, Portugal, France and the United Kingdom arrange the digital basis of buildings? Here you see the countries side by side, together with the European rules.
Three ways to arrange it
Broadly, countries choose from three approaches. Spain and Portugal set out the telecoms infrastructure of buildings in law. South Korea and London chose a voluntary label or a voluntary rating. France combines both: a legal fibre obligation and a voluntary label.
This is useful to know for the Benelux. Since 12 February 2026, the European Gigabit Infrastructure Act has set the basis in new buildings and buildings undergoing major renovation. For existing offices, there is no mandatory digital label. Other countries show what a law and a label do and do not achieve.
The countries side by side
A short overview per country. You can read more in the blocks below.
| Country | Type | Since | What it covers | Assessment or check | Existing buildings too? |
|---|---|---|---|---|---|
| South Korea | Voluntary government certificate | System since 1995, first certificates in 1999 | Cabling, ducts and rooms for equipment | Assessment by KAIT, often already in the design phase | Mainly new homes; extension not confirmed |
| Spain | Law (ICT) | 1998 | Telecoms plan with the building permit; fibre and category 6 since 2011 | Installation certificate and measurement report at completion; check of the plan voluntary | Only with a full renovation |
| Portugal | Law (ITED) with a technical manual from ANACOM | 2000 | Rooms, conduits and cables in copper, coax and fibre | Declaration by the installer to ANACOM, needed for connection | Only with renovation, with a smaller package |
| France | Law and voluntary label (R2S) | Law 2008, R2S 2018 | Fibre to every home and premises; R2S looks at six themes | Law does not test performance; R2S through the certifier Certivéa | Law only with renovation that needs a building permit; R2S also buildings in use |
| United Kingdom | Voluntary rating in London; Part R for new homes in England | Rating since October 2015; Part R since 2017 | Digital connectivity of offices; Part R: a gigabit connection in new homes since late 2022 | Assessment by WiredScore; certificate valid for two years | Rating voluntary; mainly large, new offices take part |
| European Union | Regulation (Gigabit Infrastructure Act) | Building rules since 12 February 2026; rules for the SRI by 30 June 2027 at the latest | Member states ensure compliance; in the Netherlands through the Bbl | Only with major renovation |
South Korea: a voluntary certificate that changed the market
Since 1999, South Korea has had a voluntary certificate for buildings that are ready for fast internet. Builders wanted it themselves, because buyers and tenants asked for it. In 2020, Financial News reported that over the previous six years an average of 78.5 per cent of newly completed flats received a certificate. The lesson: a voluntary label works when the buyer or tenant can see it and compare it.
Spain: no telecoms plan, no building permit
Since 1998, Spain has required a common telecoms infrastructure in buildings, the ICT. Without a telecoms plan, there is no permission to build or to carry out a major renovation. After construction, an installation certificate and a measurement report follow, but that measurement happens only once, at completion. The lesson: link requirements to moments that already exist, and keep the measurement.
Portugal: one manual that is updated again and again
Portugal regulates the telecoms infrastructure in buildings with the ITED rules. The regulator ANACOM publishes a technical manual for them, which has appeared four times since 2004, each time after a public consultation. Designers and installers complete at least 50 hours of refresher training every five years. The lesson: a method is never finished and must evolve with the technology.
France: law and label side by side
Since a 2008 law, France has required fibre in new buildings with several homes or business premises, and since 2016 in all new buildings. In addition, since 2018 there has been the voluntary Ready2Services (R2S) label for
United Kingdom: a push from the Mayor of London
In October 2015, the Mayor of London launched a voluntary rating for the digital connectivity of offices, carried out by the company WiredScore. There are four levels and a certificate is valid for two years. It is mainly owners of good buildings who take part. The lesson: a government can give a voluntary label a push, without making it mandatory or carrying it out itself.
The European basis
Since 12 February 2026, new buildings and buildings undergoing major renovation have had to be
In addition, the Smart Readiness Indicator (SRI) will become mandatory for large
What this means for the IT-Label
In all countries you see the same common thread. Laws set the basis in new buildings and in major renovations. Labels make the quality above it visible. But almost nobody measures how the network in an existing building works in practice.
That is what the
Frequently asked questions
How does your building score?
With an
Related information
IT-Label and laws and regulations for buildings
NIS2, the Dutch Cybersecurity Act, the Gigabit Infrastructure Act, EPBD, CRA and Data Act: what the new rules mean for buildings and the
Fibre optic in buildings
Why fibre optic forms the basis of the higher
Glossary: IT-Label and digital infrastructure
From audit to
IT-Label pre-inspection
A